ReliaEn documentation
These pages explain how to install ReliaEn, how its licence works and how it updates. There is one edition of ReliaEn, and every licence opens every module.
- Install: download, check and install ReliaEn; first start; installation for all users; silent installation.
- Licence and moving to a new computer: the machine code, the licence file, expiry and renewal, and moving to another computer.
- System requirements: Windows version, memory for AI Support and disk space for updates.
- Frequently asked questions: 10 questions that buyers often ask.
- Release notes 1.0.0: what the first release contains.
- Updates: how ReliaEn checks for, downloads and installs signed updates.
If these pages do not answer your question, write to sales@reliaen.com.
Abbreviations
Section titled “Abbreviations”On each page, the first use of an abbreviation gives the full term. This table lists every abbreviation on the website.
| Abbreviation | Full term |
|---|---|
| ALT | accelerated life testing |
| API | application programming interface |
| BOM | bill of materials |
| CMMS | computerised maintenance management system |
| EULA | end-user licence agreement |
| EAM | enterprise asset management |
| EDMS | electronic document management system |
| FAQ | frequently asked questions |
| FMEA | failure mode and effects analysis |
| FMECA | failure mode, effects and criticality analysis |
| FRACAS | failure reporting, analysis and corrective action system |
| FTA | fault tree analysis |
| GRP | generalised renewal process |
| HAZOP | hazard and operability study |
| IT | information technology |
| KPI | key performance indicator |
| LOPA | layer of protection analysis |
| MCF | mean cumulative function |
| MTBF | mean time between failures |
| MTTF | mean time to failure |
| MTTR | mean time to repair |
| OEE | overall equipment effectiveness |
| PC | personal computer |
| PDPA | Personal Data Protection Act |
| PM | preventive maintenance |
| RAM | reliability, availability and maintainability |
| RBD | reliability block diagram |
| RCM | reliability-centred maintenance |
| RPN | risk priority number |
| SIL | safety integrity level |
| VAT | value-added tax |
